LOAD TEST OF WINCH - NAM CONG 2 HYDROPOWER

Tuesday - 26/03/2019 09:46 1.198 0
Project name: NAM CONG 2 hydropower - LAOS; Construction contractor: Hoang Anh Attapeu Electric Company Limited; Location for implementing the project: Phuvong district, Attapeu province, southern of Laos
LOAD TEST OF WINCH - NAM CONG 2 HYDROPOWER
I. PROJECT INTRODUCTION:

The total installed capacity of Nam Cong 2 project has an installed capacity of 66 MW, an average power output of 263.22 million kWh. With a total investment of $78,980,000, the project was started in the first quarter of 2011 and is expected to be completed in the second quarter of 2017.

In addition to improving the quality of life of Attapeu people, the project also contributes to creating jobs for thousands of workers in one of the poorest provinces in Laos.

II. THE PURPOSE OF EXPERIMENT:

Winch is widely used in industry and construction, especially hydroelectric projects. Winch at hydroelectric projects often have to lift large objects, large loads. To ensure the ability to work safely, the winch needs to be checked for quality and safety before putting into use. One of the winch tests is to test the lifting capacity of the device.

II. DOWNLOAD PHOTOS:

alt

LOAD TEST OF 2X15T WHEEL DRIVE

alt

LOAD TEST OF 80T WHEEL DRIVE

alt

LOAD TEST OF 80T OVERHEAD CRANE

 CHECK THE SAFETY OF WINCH  AFTER LOAD TEST

alt

USE GATES AND CONCRETE SLABS TO MAKE COUNTERBALANCE

alt


INSTALL LOADCELL - MONITORING TEST LOAD

 THE DISPLAY OF LOAD VALUE