Inspection of Bach Dang Hotel Complex
Project: Bach Dang Hotel Complex; Location: Hai Chau District, Danang city; Owner: Bach Dang Hotel Services and Trading Joint Stock Company. Category: Hotel and office block - apartment block
The project is invested by Bach Dang Hotel Services and Trading Joint Stock Company with the total estimated capital of 700 billion VND.
Hotel tower block: 29 floors, including 226 rooms with an area of 35-60m2
Office tower block - apartment: 25 floors, including more than 3,000m2 and 70 luxury apartments.
II. INSPECTION CONTENT
1. INSPECTING ACTUAL STATE
- Survey crack
- Bore to test concrete
- Bore to determine crack depth
2. TESTING DEAD LOAD OF FLOOR
- Measure deflection, stress at floor and beams.
3. CACULATING REINFORCED STRUCTURE
- Base on design caculating result of FRP reinforcement.
(Related images)
Construction : Bach Dang hotel complex
Signal sensors
Load test by water
Load test after adhering FRP