INSPECTION OF LOAD CAPACITY OF BORED PILE BY PILE DRIVING ANALYZER - PDA
PROJECT: INVESTMENT IN CONSTRUCTING TRI BINH ROAD – DUNG QUOC PORT( KM 0+00-KM 8+743.72).
CONSTRUCTION: Tra Bong Bridge Km 5+293.32
Owner: Management Board of Infrastructure Investment Projects.
Contractor: Phuc Loc joint stock company
PROJECT INTRODUCTION
- Tra Bong Bridge crosses the Tra Bong River in Binh Chanh Commune - Binh Son District - Quang Ngai Province. The construction area is 3.0km away from the sea.
Total length of bridge L= 668.10m
Main technical parameters:
- Construction scale: Permanent structure with reinforced concrete and prestressed reinforced concrete.
- Flood frequency design : P=1%
- Boat-through size: Boat-through river level IV, BxH= 40x6 m.
- Load test design: Design load HL-93, group of three people kN/m2.
- Earthquake level: Level 6 (MSK-64 system), accelerator coefficient of foundation A=0.052.
- Bridge size: B= 2 + 15.625 + 1.5 = 19.125m.
- Speed design: V= 80 km/h.
In-situ construction images:
Set up pile surface
Install hammer support
Install sensor on pile body
Implementing experiment
ANALYSIS RESULT: